Atom Telecom
DocumentationAI Assistant
  1. Home
  2. Support
  3. NBN
  4. NBN Service Class Description

NBN Service Class Description

1 min readNBN
Table (Header Row)
Service Class
Description
0Planned to be serviced by Fibre in the future
1Serviceable by Fibre, no drop or NTD in place
2Serviceable by Fibre, drop in place, no NTD in place
3Serviceable by Fibre, drop and NTD in place
4Planned to be serviced by Wireless
5Serviceable by Wireless, NTD not installed
6Serviceable by Wireless, NTD installed
7Planned to be serviced by Satellite
8Serviceable by Satellite, Satellite - NTD not installed
9Serviceable by Satellite, Satellite - NTD installed
10Planned to be serviceable by Copper
11Serviceable by copper, active node present
12Serviceable by copper, jumpering is required
13Serviceable by copper, infrastructure in place
20Planned to be serviced by HFC, outside plant does not exist
21Serviceable by HFC, the location has a street TAP but requires a lead-in, PCD, internal tie cable, and wall-plate/socket
22Serviceable by HFC, the location has a street TAP, lead-in & PCD in place, but no internal tie-cables with wall plates/sockets
23Serviceable by HFC, the location has a wall-plate/socket but no HFC NTD
24Serviceable by HFC, Location has a wall-plate/socket & HFC NTD and is ''Ready to Connect
30Planned to be serviceable by FTTC
31Serviceable by FTTC, no line available (NCD required)
32Serviceable by FTTC, cut-in required (NCD required)
33Serviceable by FTTC, cut-in complete (NCD required)
34Serviceable by FTTC, infrastructure in place (Check NCD status)
Was this article helpful?

Related articles

Installation Types

General Installation

Upgrade to FTTP

Installation Timeline

Need more help?

Chat with our AI assistant

Back to NBN

Copyright © 2025 Atom Telecom. All rights reserved.